{"id":31702,"date":"2026-10-23T09:23:50","date_gmt":"2026-10-23T01:23:50","guid":{"rendered":"https:\/\/www.cnspd.com\/?p=31702"},"modified":"2026-10-23T09:26:47","modified_gmt":"2026-10-23T01:26:47","slug":"ats-for-generator-rooms-and-backup-power-cabinets-generator-ats-panel-design-guide","status":"publish","type":"post","link":"https:\/\/www.cnspd.com\/pt\/ats-generator-room-backup-power-cabinet\/","title":{"rendered":"ATS para salas de geradores e arm\u00e1rios de alimenta\u00e7\u00e3o de emerg\u00eancia: Guia de conce\u00e7\u00e3o de pain\u00e9is ATS para geradores"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"31702\" class=\"elementor elementor-31702\" data-elementor-post-type=\"post\">\n\t\t\t\t<div class=\"elementor-element elementor-element-4fdb92b e-flex e-con-boxed e-con e-parent\" data-id=\"4fdb92b\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-88c4ff2 elementor-widget elementor-widget-html\" data-id=\"88c4ff2\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"html.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<style>\r\n  .leeyee-ats75 {\r\n    --ly-blue: #004898;\r\n    --ly-blue-dark: #00366f;\r\n    --ly-blue-soft: #eef5ff;\r\n    --ly-blue-soft-2: #f7fbff;\r\n    --ly-text: #263746;\r\n    --ly-muted: #5f6f7d;\r\n    --ly-border: #d9e4ee;\r\n    --ly-warning-bg: #fff9ed;\r\n    --ly-warning-border: #d59a28;\r\n    --ly-success-bg: #f3faf7;\r\n    --ly-success-border: #34835d;\r\n    width: 100%;\r\n    max-width: 860px;\r\n    margin: 0 auto;\r\n    padding: 8px 20px 54px;\r\n    box-sizing: border-box;\r\n    color: var(--ly-text);\r\n    font-size: 17px;\r\n    line-height: 1.72;\r\n    overflow-wrap: break-word;\r\n  }\r\n\r\n  .leeyee-ats75 *,\r\n  .leeyee-ats75 *::before,\r\n  .leeyee-ats75 *::after {\r\n    box-sizing: border-box;\r\n  }\r\n\r\n  .leeyee-ats75 p {\r\n    margin: 0 0 18px;\r\n  }\r\n\r\n  .leeyee-ats75 strong {\r\n    color: #172c3d;\r\n    font-weight: 700;\r\n  }\r\n\r\n  .leeyee-ats75 h2 {\r\n    margin: 54px 0 18px;\r\n    color: #18364e;\r\n    font-size: 32px;\r\n    line-height: 1.25;\r\n    font-weight: 750;\r\n    letter-spacing: -0.02em;\r\n  }\r\n\r\n  .leeyee-ats75 h3 {\r\n    margin: 32px 0 12px;\r\n    color: #20415c;\r\n    font-size: 23px;\r\n    line-height: 1.35;\r\n    font-weight: 730;\r\n  }\r\n\r\n  .leeyee-ats75 a {\r\n    color: var(--ly-blue);\r\n    text-decoration-thickness: 1px;\r\n    text-underline-offset: 3px;\r\n  }\r\n\r\n  .leeyee-ats75 ul,\r\n  .leeyee-ats75 ol {\r\n    margin: 12px 0 22px;\r\n    padding-left: 25px;\r\n  }\r\n\r\n  .leeyee-ats75 li {\r\n    margin: 7px 0;\r\n  }\r\n\r\n  .leeyee-ats75 .ats75-kicker {\r\n    display: inline-block;\r\n    margin: 0 0 10px;\r\n    color: var(--ly-blue);\r\n    font-size: 13px;\r\n    line-height: 1.4;\r\n    font-weight: 800;\r\n    letter-spacing: 0.06em;\r\n    text-transform: uppercase;\r\n  }\r\n\r\n  .leeyee-ats75 .ats75-intro {\r\n    margin: 0 0 24px;\r\n    font-size: 18px;\r\n    line-height: 1.7;\r\n    color: #314758;\r\n  }\r\n\r\n  .leeyee-ats75 .ats75-quick {\r\n    margin: 28px 0 34px;\r\n    padding: 24px 26px;\r\n    border: 1px solid #cfe0ef;\r\n    border-left: 4px solid var(--ly-blue);\r\n    border-radius: 10px;\r\n    background: var(--ly-blue-soft-2);\r\n  }\r\n\r\n  .leeyee-ats75 .ats75-quick h2 {\r\n    margin: 0 0 12px;\r\n    color: var(--ly-blue);\r\n    font-size: 24px;\r\n  }\r\n\r\n  .leeyee-ats75 .ats75-quick p:last-child {\r\n    margin-bottom: 0;\r\n  }\r\n\r\n  .leeyee-ats75 .ats75-paths {\r\n    display: grid;\r\n    grid-template-columns: 1fr 1fr;\r\n    gap: 16px;\r\n    margin: 24px 0 34px;\r\n  }\r\n\r\n  .leeyee-ats75 .ats75-path {\r\n    padding: 18px 20px;\r\n    border: 1px solid #d8e5ef;\r\n    border-radius: 9px;\r\n    background: #fff;\r\n  }\r\n\r\n  .leeyee-ats75 .ats75-path h3 {\r\n    margin: 0 0 9px;\r\n    color: var(--ly-blue);\r\n    font-size: 19px;\r\n  }\r\n\r\n  .leeyee-ats75 .ats75-path p {\r\n    margin: 0;\r\n    color: #3f5261;\r\n    font-size: 15px;\r\n    line-height: 1.6;\r\n  }\r\n\r\n  .leeyee-ats75 .ats75-figure {\r\n    margin: 30px 0 38px;\r\n  }\r\n\r\n  .leeyee-ats75 .ats75-figure img {\r\n    display: block;\r\n    width: 100%;\r\n    height: auto;\r\n    margin: 0;\r\n    border: 1px solid #dfe7ee;\r\n    border-radius: 10px;\r\n    background: #fff;\r\n  }\r\n\r\n  .leeyee-ats75 .ats75-figure figcaption {\r\n    margin: 10px 5px 0;\r\n    color: var(--ly-muted);\r\n    font-size: 14px;\r\n    line-height: 1.55;\r\n  }\r\n\r\n  .leeyee-ats75 .ats75-product-figure {\r\n    margin: 26px auto 34px;\r\n    max-width: 680px;\r\n  }\r\n\r\n  .leeyee-ats75 .ats75-product-figure img {\r\n    display: block;\r\n    width: 100%;\r\n    height: auto;\r\n    margin: 0 auto;\r\n    border: 1px solid #dce5ec;\r\n    border-radius: 12px;\r\n    background: #fff;\r\n    box-shadow: 0 5px 18px rgba(26, 55, 78, 0.08);\r\n  }\r\n\r\n  .leeyee-ats75 .ats75-product-figure figcaption {\r\n    margin: 11px 5px 0;\r\n    color: var(--ly-muted);\r\n    font-size: 14px;\r\n    line-height: 1.55;\r\n    text-align: center;\r\n  }\r\n\r\n  .leeyee-ats75 .ats75-note,\r\n  .leeyee-ats75 .ats75-warning,\r\n  .leeyee-ats75 .ats75-boundary {\r\n    margin: 26px 0;\r\n    padding: 20px 22px;\r\n    border-radius: 9px;\r\n  }\r\n\r\n  .leeyee-ats75 .ats75-note {\r\n    border-left: 4px solid var(--ly-blue);\r\n    background: var(--ly-blue-soft);\r\n  }\r\n\r\n  .leeyee-ats75 .ats75-warning {\r\n    border: 1px solid #ead7ad;\r\n    border-left: 4px solid var(--ly-warning-border);\r\n    background: var(--ly-warning-bg);\r\n  }\r\n\r\n  .leeyee-ats75 .ats75-boundary {\r\n    border: 1px solid #cfe4d8;\r\n    border-left: 4px solid var(--ly-success-border);\r\n    background: var(--ly-success-bg);\r\n  }\r\n\r\n  .leeyee-ats75 .ats75-table-wrap {\r\n    width: 100%;\r\n    margin: 22px 0 12px;\r\n    border: 1px solid var(--ly-border);\r\n    border-radius: 9px;\r\n    overflow: hidden;\r\n  }\r\n\r\n  .leeyee-ats75 table {\r\n    width: 100%;\r\n    margin: 0;\r\n    border-collapse: collapse;\r\n    table-layout: fixed;\r\n    background: #fff;\r\n  }\r\n\r\n  .leeyee-ats75 th,\r\n  .leeyee-ats75 td {\r\n    padding: 13px 14px;\r\n    border-right: 1px solid #e5ecf2;\r\n    border-bottom: 1px solid #e5ecf2;\r\n    vertical-align: top;\r\n    text-align: left;\r\n    line-height: 1.5;\r\n    overflow-wrap: anywhere;\r\n  }\r\n\r\n  .leeyee-ats75 th:last-child,\r\n  .leeyee-ats75 td:last-child {\r\n    border-right: 0;\r\n  }\r\n\r\n  .leeyee-ats75 tr:last-child td {\r\n    border-bottom: 0;\r\n  }\r\n\r\n  .leeyee-ats75 th {\r\n    background: var(--ly-blue);\r\n    color: #fff;\r\n    font-size: 15px;\r\n    font-weight: 750;\r\n  }\r\n\r\n  .leeyee-ats75 td {\r\n    color: #354958;\r\n    font-size: 15px;\r\n  }\r\n\r\n  .leeyee-ats75 .ats75-table-note {\r\n    margin: 9px 2px 26px;\r\n    color: var(--ly-muted);\r\n    font-size: 14px;\r\n    line-height: 1.55;\r\n  }\r\n\r\n  .leeyee-ats75 .ats75-flow {\r\n    margin: 18px 0 28px;\r\n    padding: 0;\r\n    list-style: none;\r\n    counter-reset: ats75step;\r\n  }\r\n\r\n  .leeyee-ats75 .ats75-flow li {\r\n    position: relative;\r\n    margin: 0 0 14px;\r\n    padding: 15px 16px 15px 54px;\r\n    border-bottom: 1px solid #e5ebf0;\r\n  }\r\n\r\n  .leeyee-ats75 .ats75-flow li::before {\r\n    counter-increment: ats75step;\r\n    content: counter(ats75step);\r\n    position: absolute;\r\n    top: 14px;\r\n    left: 8px;\r\n    display: flex;\r\n    width: 31px;\r\n    height: 31px;\r\n    align-items: center;\r\n    justify-content: center;\r\n    border-radius: 50%;\r\n    background: var(--ly-blue);\r\n    color: #fff;\r\n    font-size: 14px;\r\n    line-height: 1;\r\n    font-weight: 800;\r\n  }\r\n\r\n  .leeyee-ats75 .ats75-checklist {\r\n    margin: 26px 0;\r\n    padding: 24px 25px;\r\n    border: 1px solid #d6e3ee;\r\n    border-radius: 10px;\r\n    background: #fbfdff;\r\n  }\r\n\r\n  .leeyee-ats75 .ats75-checklist h3 {\r\n    margin-top: 0;\r\n  }\r\n\r\n  .leeyee-ats75 .ats75-checklist ul {\r\n    margin-bottom: 0;\r\n    columns: 2;\r\n    column-gap: 34px;\r\n  }\r\n\r\n  .leeyee-ats75 .ats75-checklist li {\r\n    break-inside: avoid;\r\n  }\r\n\r\n  .leeyee-ats75 .ats75-cta {\r\n    margin: 30px 0 42px;\r\n    padding: 25px 26px;\r\n    border: 1px solid #caddeb;\r\n    border-radius: 11px;\r\n    background: var(--ly-blue-soft-2);\r\n    text-align: left;\r\n  }\r\n\r\n  .leeyee-ats75 .ats75-cta h3 {\r\n    margin: 0 0 9px;\r\n    color: #18364e;\r\n  }\r\n\r\n  .leeyee-ats75 .ats75-cta p {\r\n    margin-bottom: 18px;\r\n  }\r\n\r\n  .leeyee-ats75 .leeyee-about-btn-light.leeyee-site-popup-btn {\r\n    appearance: none;\r\n    -webkit-appearance: none;\r\n    display: inline-flex;\r\n    min-height: 50px;\r\n    max-width: 100%;\r\n    align-items: center;\r\n    justify-content: center;\r\n    padding: 12px 23px;\r\n    border: 2px solid var(--ly-blue);\r\n    border-radius: 10px;\r\n    background: #fff;\r\n    color: var(--ly-blue);\r\n    box-shadow: 0 4px 12px rgba(0, 72, 152, 0.11);\r\n    font-family: inherit;\r\n    font-size: 16px;\r\n    line-height: 1.25;\r\n    font-weight: 700;\r\n    text-align: center;\r\n    text-decoration: none;\r\n    cursor: pointer;\r\n    transition:\r\n      background-color 0.18s ease,\r\n      color 0.18s ease,\r\n      transform 0.18s ease,\r\n      box-shadow 0.18s ease;\r\n  }\r\n\r\n  .leeyee-ats75 .leeyee-about-btn-light.leeyee-site-popup-btn:hover {\r\n    background: var(--ly-blue);\r\n    color: #fff;\r\n    transform: translateY(-1px);\r\n    box-shadow: 0 6px 15px rgba(0, 72, 152, 0.17);\r\n  }\r\n\r\n  .leeyee-ats75 .leeyee-about-btn-light.leeyee-site-popup-btn:focus-visible {\r\n    outline: 3px solid rgba(0, 72, 152, 0.27);\r\n    outline-offset: 3px;\r\n  }\r\n\r\n  .leeyee-ats75 .leeyee-about-btn-light.leeyee-site-popup-btn .w-btn-label {\r\n    display: inline-block;\r\n  }\r\n\r\n  .leeyee-ats75 .ats75-faq {\r\n    margin: 20px 0 0;\r\n    border-top: 1px solid var(--ly-border);\r\n  }\r\n\r\n  .leeyee-ats75 .ats75-faq-item {\r\n    padding: 20px 0;\r\n    border-bottom: 1px solid var(--ly-border);\r\n  }\r\n\r\n  .leeyee-ats75 .ats75-faq-item h3 {\r\n    margin: 0 0 8px;\r\n    font-size: 20px;\r\n  }\r\n\r\n  .leeyee-ats75 .ats75-faq-item p:last-child {\r\n    margin-bottom: 0;\r\n  }\r\n\r\n  .leeyee-ats75 .ats75-ref-list {\r\n    margin-top: 14px;\r\n    padding-left: 24px;\r\n    color: #526472;\r\n    font-size: 14px;\r\n    line-height: 1.62;\r\n  }\r\n\r\n  .leeyee-ats75 .ats75-ref-list li {\r\n    margin: 9px 0;\r\n  }\r\n\r\n  .leeyee-ats75 .ats75-source-mark {\r\n    white-space: nowrap;\r\n    color: var(--ly-blue);\r\n    font-size: 0.88em;\r\n    font-weight: 650;\r\n  }\r\n\r\n  @media (max-width: 1024px) {\r\n    .leeyee-ats75 {\r\n      max-width: 840px;\r\n    }\r\n  }\r\n\r\n  @media (max-width: 768px) {\r\n    .leeyee-ats75 {\r\n      padding: 4px 18px 44px;\r\n      font-size: 16px;\r\n      line-height: 1.68;\r\n    }\r\n\r\n    .leeyee-ats75 h2 {\r\n      margin-top: 44px;\r\n      font-size: 28px;\r\n    }\r\n\r\n    .leeyee-ats75 h3 {\r\n      font-size: 21px;\r\n    }\r\n\r\n    .leeyee-ats75 .ats75-intro {\r\n      font-size: 17px;\r\n    }\r\n\r\n    .leeyee-ats75 .ats75-paths {\r\n      grid-template-columns: 1fr;\r\n    }\r\n\r\n    .leeyee-ats75 .ats75-quick,\r\n    .leeyee-ats75 .ats75-cta,\r\n    .leeyee-ats75 .ats75-checklist {\r\n      padding: 20px;\r\n    }\r\n\r\n    .leeyee-ats75 .ats75-checklist ul {\r\n      columns: 1;\r\n    }\r\n\r\n    .leeyee-ats75 table,\r\n    .leeyee-ats75 thead,\r\n    .leeyee-ats75 tbody,\r\n    .leeyee-ats75 tr,\r\n    .leeyee-ats75 th,\r\n    .leeyee-ats75 td {\r\n      display: block;\r\n      width: 100%;\r\n    }\r\n\r\n    .leeyee-ats75 thead {\r\n      display: none;\r\n    }\r\n\r\n    .leeyee-ats75 tr {\r\n      padding: 13px 15px;\r\n      border-bottom: 1px solid var(--ly-border);\r\n    }\r\n\r\n    .leeyee-ats75 tr:last-child {\r\n      border-bottom: 0;\r\n    }\r\n\r\n    .leeyee-ats75 td {\r\n      position: relative;\r\n      padding: 6px 0 6px 42%;\r\n      border: 0;\r\n      min-height: 34px;\r\n      font-size: 15px;\r\n    }\r\n\r\n    .leeyee-ats75 td::before {\r\n      content: attr(data-label);\r\n      position: absolute;\r\n      top: 6px;\r\n      left: 0;\r\n      width: 38%;\r\n      padding-right: 10px;\r\n      color: #193e5d;\r\n      font-weight: 700;\r\n    }\r\n  }\r\n\r\n  @media (max-width: 540px) {\r\n    .leeyee-ats75 {\r\n      padding-right: 15px;\r\n      padding-left: 15px;\r\n    }\r\n\r\n    .leeyee-ats75 h2 {\r\n      font-size: 26px;\r\n    }\r\n\r\n    .leeyee-ats75 .ats75-quick h2 {\r\n      font-size: 22px;\r\n    }\r\n\r\n    .leeyee-ats75 .ats75-note,\r\n    .leeyee-ats75 .ats75-warning,\r\n    .leeyee-ats75 .ats75-boundary {\r\n      padding: 17px 18px;\r\n    }\r\n\r\n    .leeyee-ats75 td {\r\n      padding-left: 0;\r\n      padding-top: 30px;\r\n    }\r\n\r\n    .leeyee-ats75 td::before {\r\n      top: 5px;\r\n      width: 100%;\r\n    }\r\n\r\n    .leeyee-ats75 .leeyee-about-btn-light.leeyee-site-popup-btn {\r\n      width: 100%;\r\n      padding-right: 16px;\r\n      padding-left: 16px;\r\n    }\r\n  }\r\n\r\n  @media (max-width: 390px) {\r\n    .leeyee-ats75 {\r\n      padding-right: 12px;\r\n      padding-left: 12px;\r\n    }\r\n\r\n    .leeyee-ats75 h2 {\r\n      font-size: 24px;\r\n    }\r\n\r\n    .leeyee-ats75 h3 {\r\n      font-size: 20px;\r\n    }\r\n\r\n    .leeyee-ats75 .ats75-quick,\r\n    .leeyee-ats75 .ats75-cta,\r\n    .leeyee-ats75 .ats75-checklist {\r\n      padding: 17px;\r\n    }\r\n\r\n    .leeyee-ats75 .ats75-flow li {\r\n      padding-right: 4px;\r\n      padding-left: 48px;\r\n    }\r\n  }\r\n<\/style>\r\n\r\n<article class=\"leeyee-ats75\">\r\n  <span class=\"ats75-kicker\">Generator Room &amp; Backup Cabinet Integration Guide<\/span>\r\n\r\n  <p class=\"ats75-intro\">\r\n    A generator ATS panel should be designed as a complete backup-power system, not as an ATS placed alone inside a cabinet. The panel builder must coordinate the utility source, generator source, upstream protection, compact ATS, surge protection, generator controller, status signals, cable routing and protected load.\r\n  <\/p>\r\n\r\n  <p class=\"ats75-intro\">\r\n    The real engineering question is therefore: <strong>how should a compact ATS be integrated into a generator room or backup power cabinet, and what must be confirmed before the ATS model and cabinet drawing are frozen?<\/strong>\r\n  <\/p>\r\n\r\n  <section class=\"ats75-quick\">\r\n    <div id=\"ez-toc-container\" class=\"ez-toc-v2_0_89 counter-hierarchy ez-toc-counter ez-toc-custom ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"#\" data-href=\"https:\/\/www.cnspd.com\/pt\/ats-generator-room-backup-power-cabinet\/#quick-answer\" >Quick Answer<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"#\" data-href=\"https:\/\/www.cnspd.com\/pt\/ats-generator-room-backup-power-cabinet\/#where-does-the-ats-sit-in-a-generator-backup-system\" >Where Does the ATS Sit in a Generator Backup System?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"#\" data-href=\"https:\/\/www.cnspd.com\/pt\/ats-generator-room-backup-power-cabinet\/#what-does-each-device-in-the-backup-power-cabinet-do\" >What Does Each Device in the Backup Power Cabinet Do?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"#\" data-href=\"https:\/\/www.cnspd.com\/pt\/ats-generator-room-backup-power-cabinet\/#power-circuit-and-control-circuit-should-be-designed-separately\" >Power Circuit and Control Circuit Should Be Designed Separately<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"#\" data-href=\"https:\/\/www.cnspd.com\/pt\/ats-generator-room-backup-power-cabinet\/#how-does-the-generator-start-signal-fit-into-the-system\" >How Does the Generator Start Signal Fit into the System?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"#\" data-href=\"https:\/\/www.cnspd.com\/pt\/ats-generator-room-backup-power-cabinet\/#which-ats-status-signals-should-be-defined\" >Which ATS Status Signals Should Be Defined?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"#\" data-href=\"https:\/\/www.cnspd.com\/pt\/ats-generator-room-backup-power-cabinet\/#how-should-mccbs-and-the-ats-be-coordinated\" >How Should MCCBs and the ATS Be Coordinated?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"#\" data-href=\"https:\/\/www.cnspd.com\/pt\/ats-generator-room-backup-power-cabinet\/#where-does-the-spd-fit-in-the-ats-cabinet\" >Where Does the SPD Fit in the ATS Cabinet?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"#\" data-href=\"https:\/\/www.cnspd.com\/pt\/ats-generator-room-backup-power-cabinet\/#how-should-a-compact-ats-be-arranged-inside-the-cabinet\" >How Should a Compact ATS Be Arranged Inside the Cabinet?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"#\" data-href=\"https:\/\/www.cnspd.com\/pt\/ats-generator-room-backup-power-cabinet\/#a-practical-generator-ats-panel-design-sequence\" >A Practical Generator ATS Panel Design Sequence<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"#\" data-href=\"https:\/\/www.cnspd.com\/pt\/ats-generator-room-backup-power-cabinet\/#what-leeyee-supplies-%e2%80%94-and-what-the-panel-builder-integrates\" >What LEEYEE Supplies \u2014 and What the Panel Builder Integrates<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"#\" data-href=\"https:\/\/www.cnspd.com\/pt\/ats-generator-room-backup-power-cabinet\/#what-should-you-send-before-ordering-the-ats\" >What Should You Send Before Ordering the ATS?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-13\" href=\"#\" data-href=\"https:\/\/www.cnspd.com\/pt\/ats-generator-room-backup-power-cabinet\/#common-generator-ats-panel-design-mistakes\" >Common Generator ATS Panel Design Mistakes<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-14\" href=\"#\" data-href=\"https:\/\/www.cnspd.com\/pt\/ats-generator-room-backup-power-cabinet\/#faq-for-generator-rooms-and-backup-power-cabinets\" >FAQ for Generator Rooms and Backup Power Cabinets<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-15\" href=\"#\" data-href=\"https:\/\/www.cnspd.com\/pt\/ats-generator-room-backup-power-cabinet\/#references\" >References<\/a><\/li><\/ul><\/nav><\/div>\n<h2><span class=\"ez-toc-section\" id=\"quick-answer\"><\/span>Quick Answer<span class=\"ez-toc-section-end\"><\/span><\/h2>\r\n    <p>\r\n      In a typical utility-to-generator backup system, the <strong>Utility \/ Normal source and Generator \/ Emergency source feed the ATS, and the ATS connects the selected source to the protected load<\/strong>. Transfer switching equipment is designed to transfer a load between power-supply sources. <span class=\"ats75-source-mark\">[1]<\/span>\r\n    <\/p>\r\n    <p>\r\n      A generator ATS panel design should be developed around two separate paths: the <strong>power path<\/strong> from Utility and Generator through protection and the ATS to the load, and the <strong>control\/status path<\/strong> between the ATS, genset controller, local indication and remote monitoring.\r\n    <\/p>\r\n    <p>\r\n      <strong>LEEYEE supplies the compact ATS device.<\/strong> The complete cabinet, feeder protection, busbars, cables, SPD arrangement, ventilation, generator controller and final integration are normally designed and verified by the panel builder or system integrator for the specific project.\r\n    <\/p>\r\n  <\/section>\r\n\r\n  <figure class=\"ats75-figure\">\r\n    <img fetchpriority=\"high\"\r\n      src=\"https:\/\/www.cnspd.com\/wp-content\/uploads\/2026\/10\/generator-room-ats-backup-power-system-diagram.webp\"\r\n      alt=\"Generator room backup power system diagram showing utility, generator, MCCBs, compact ATS, SPD, controller, and load\"\r\n      width=\"1448\"\r\n      height=\"1086\"\r\n      loading=\"eager\"\r\n      decoding=\"async\"\r\n    >\r\n    <figcaption>\r\n      Conceptual utility-to-generator backup architecture. The ATS transfers the load between two sources, while protection, surge protection and generator control remain separate functions that must be coordinated for the project.\r\n    <\/figcaption>\r\n  <\/figure>\r\n\r\n  <div class=\"ats75-paths\">\r\n    <div class=\"ats75-path\">\r\n      <h3>Power Path<\/h3>\r\n      <p>\r\n        Utility \u2192 upstream protection \u2192 ATS Normal input<br>\r\n        Generator \u2192 upstream protection \u2192 ATS Emergency input<br>\r\n        ATS output \u2192 protected load\r\n      <\/p>\r\n    <\/div>\r\n\r\n    <div class=\"ats75-path\">\r\n      <h3>Control &amp; Status Path<\/h3>\r\n      <p>\r\n        ATS \/ controller \u2194 generator start interface<br>\r\n        ATS status \u2192 local indicators \/ BMS \/ PLC where supported\r\n      <\/p>\r\n    <\/div>\r\n  <\/div>\r\n\r\n  <h2><span class=\"ez-toc-section\" id=\"where-does-the-ats-sit-in-a-generator-backup-system\"><\/span>Where Does the ATS Sit in a Generator Backup System?<span class=\"ez-toc-section-end\"><\/span><\/h2>\r\n\r\n  <p>\r\n    IEC 60947-6-1:2026 covers transfer switching equipment used to transfer a load between supply sources. In a generator backup application, the ATS normally sits between the two available sources and the downstream load. <span class=\"ats75-source-mark\">[1]<\/span>\r\n  <\/p>\r\n\r\n  <p>\r\n    For a conventional utility-generator arrangement, this means one <strong>Normal source<\/strong>, usually utility power, one <strong>Emergency source<\/strong>, usually the generator, and one load connection on the output side of the ATS. Eaton describes utility-generator as a common two-source transfer-switch arrangement for standby power systems. <span class=\"ats75-source-mark\">[5]<\/span>\r\n  <\/p>\r\n\r\n  <div class=\"ats75-note\">\r\n    <strong>Engineering meaning:<\/strong> the ATS is the source-selection device in the power path. It does not replace the project design for upstream protection, cables, SPD coordination, enclosure construction, thermal performance, generator controls or assembly verification.\r\n  <\/div>\r\n\r\n  <h2><span class=\"ez-toc-section\" id=\"what-does-each-device-in-the-backup-power-cabinet-do\"><\/span>What Does Each Device in the Backup Power Cabinet Do?<span class=\"ez-toc-section-end\"><\/span><\/h2>\r\n\r\n  <p>\r\n    ATS, MCCB, SPD and generator controller are often shown close together on a cabinet drawing, but they have different functions. Understanding that separation is essential before the panel layout is finalized.\r\n  <\/p>\r\n\r\n  <div class=\"ats75-table-wrap\">\r\n    <table>\r\n      <thead>\r\n        <tr>\r\n          <th>Device<\/th>\r\n          <th>Main function<\/th>\r\n          <th>What must be confirmed<\/th>\r\n        <\/tr>\r\n      <\/thead>\r\n      <tbody>\r\n        <tr>\r\n          <td data-label=\"Device\"><strong>Compact ATS<\/strong><\/td>\r\n          <td data-label=\"Main function\">Transfers the load between the Normal and Emergency sources.<\/td>\r\n          <td data-label=\"Confirm\">Rated current, poles, system voltage, transfer logic, dimensions and terminal arrangement.<\/td>\r\n        <\/tr>\r\n        <tr>\r\n          <td data-label=\"Device\"><strong>Upstream MCCB \/ protective device<\/strong><\/td>\r\n          <td data-label=\"Main function\">Provides project-selected feeder protection and isolation.<\/td>\r\n          <td data-label=\"Confirm\">Fault level, protective-device rating, coordination and conductor protection.<\/td>\r\n        <\/tr>\r\n        <tr>\r\n          <td data-label=\"Device\"><strong>SPD<\/strong><\/td>\r\n          <td data-label=\"Main function\">Limits transient overvoltages and diverts surge current. <span class=\"ats75-source-mark\">[3]<\/span><\/td>\r\n          <td data-label=\"Confirm\">System voltage, earthing arrangement, SPD type, protection mode, position and coordination. <span class=\"ats75-source-mark\">[4]<\/span><\/td>\r\n        <\/tr>\r\n        <tr>\r\n          <td data-label=\"Device\"><strong>Genset controller<\/strong><\/td>\r\n          <td data-label=\"Main function\">Controls and supervises generator-set operation according to the generator system design.<\/td>\r\n          <td data-label=\"Confirm\">Start interface, control conditions, alarms, permissives and genset documentation.<\/td>\r\n        <\/tr>\r\n        <tr>\r\n          <td data-label=\"Device\"><strong>Status \/ remote interface<\/strong><\/td>\r\n          <td data-label=\"Main function\">Provides local or remote source and transfer information where supported.<\/td>\r\n          <td data-label=\"Confirm\">Required contacts, terminal definitions, BMS\/PLC interface and model-specific availability.<\/td>\r\n        <\/tr>\r\n      <\/tbody>\r\n    <\/table>\r\n  <\/div>\r\n\r\n  <p class=\"ats75-table-note\">\r\n    Procurement conclusion: the ATS should be selected after the source arrangement, protection concept, physical cabinet space and required control interface are understood. Current rating alone is not enough.\r\n  <\/p>\r\n\r\n  <h2><span class=\"ez-toc-section\" id=\"power-circuit-and-control-circuit-should-be-designed-separately\"><\/span>Power Circuit and Control Circuit Should Be Designed Separately<span class=\"ez-toc-section-end\"><\/span><\/h2>\r\n\r\n  <p>\r\n    A generator backup cabinet becomes easier to design and troubleshoot when the system is divided into the <strong>power circuit<\/strong> and the <strong>control\/status circuit<\/strong>.\r\n  <\/p>\r\n\r\n  <h3>Power circuit<\/h3>\r\n\r\n  <p>\r\n    The power circuit carries load current. In a typical utility-generator system it includes the Normal source, Emergency source, project-selected upstream protective devices, ATS power poles and outgoing load conductors.\r\n  <\/p>\r\n\r\n  <h3>Control and status circuit<\/h3>\r\n\r\n  <p>\r\n    The control circuit carries commands and status information rather than load current. Depending on the ATS and generator-control architecture, this may include generator-start commands, source-available signals, transfer-position indication and fault or alarm outputs.\r\n  <\/p>\r\n\r\n  <figure class=\"ats75-figure\">\r\n    <img loading=\"lazy\"\r\n      src=\"https:\/\/www.cnspd.com\/wp-content\/uploads\/2026\/10\/ats-power-circuit-vs-control-signal-diagram.webp\"\r\n      alt=\"ATS power circuit versus control signal diagram for generator backup systems\"\r\n      width=\"1448\"\r\n      height=\"1086\"\r\n      loading=\"lazy\"\r\n      decoding=\"async\"\r\n    >\r\n    <figcaption>\r\n      Power conductors carry the load; control and status wiring carries commands and information. The signal labels shown are project requirements to verify, not a claim that every ATS model provides every terminal or communication function.\r\n    <\/figcaption>\r\n  <\/figure>\r\n\r\n  <div class=\"ats75-warning\">\r\n    <strong>Do not wire from a conceptual diagram alone.<\/strong>\r\n    Generator-start terminals, source-available contacts, position outputs, alarm outputs, contact ratings and control voltages must be confirmed from the actual ATS and genset-controller documentation before panel wiring.\r\n  <\/div>\r\n\r\n  <h2><span class=\"ez-toc-section\" id=\"how-does-the-generator-start-signal-fit-into-the-system\"><\/span>How Does the Generator Start Signal Fit into the System?<span class=\"ez-toc-section-end\"><\/span><\/h2>\r\n\r\n  <p>\r\n    In many automatic utility-generator systems, the transfer-switch control monitors the preferred source and initiates generator starting when that source becomes unacceptable. After the generator source reaches acceptable conditions, the load can be transferred to the Emergency source. Cummins documents this general operating sequence for its utility-generator transfer-switch systems. <span class=\"ats75-source-mark\">[6]<\/span>\r\n  <\/p>\r\n\r\n  <p>\r\n    This does <strong>not<\/strong> mean that every ATS and genset use one universal start-signal arrangement. The actual interface may depend on ATS controller design, genset controller logic, contact type, control supply and project requirements.\r\n  <\/p>\r\n\r\n  <div class=\"ats75-note\">\r\n    <strong>Before wiring:<\/strong> check the ATS terminal diagram and genset-controller documentation together. Never assume that the same terminal numbers or control-voltage conditions apply across different products.\r\n  <\/div>\r\n\r\n  <h2><span class=\"ez-toc-section\" id=\"which-ats-status-signals-should-be-defined\"><\/span>Which ATS Status Signals Should Be Defined?<span class=\"ez-toc-section-end\"><\/span><\/h2>\r\n\r\n  <p>\r\n    Generator-room and backup-power panels often require more than a simple Auto\/Manual indication. The operator, BMS or PLC may need to know whether each source is available and which source is supplying the load.\r\n  <\/p>\r\n\r\n  <p>Useful project signal points to define include:<\/p>\r\n\r\n  <ul>\r\n    <li><strong>Normal Available<\/strong> \u2014 Normal source satisfies the defined availability conditions.<\/li>\r\n    <li><strong>Emergency Available<\/strong> \u2014 Emergency source satisfies the defined availability conditions.<\/li>\r\n    <li><strong>Load to Normal<\/strong> \u2014 the ATS is in the Normal-source position.<\/li>\r\n    <li><strong>Load to Emergency<\/strong> \u2014 the ATS is in the Emergency-source position.<\/li>\r\n    <li><strong>Fault Alarm<\/strong> \u2014 project-defined fault or alarm output where the selected configuration supports it.<\/li>\r\n  <\/ul>\r\n\r\n  <p>\r\n    These should be treated as <strong>functional requirements to confirm<\/strong>. They are not a blanket statement that every compact ATS provides all of these outputs.\r\n  <\/p>\r\n\r\n  <p>\r\n    If remote supervision is required, define whether the project needs dry contacts, hard-wired digital signals or a communication interface. The selected ATS must then be checked against that requirement before the cabinet schematic is approved.\r\n  <\/p>\r\n\r\n  <h2><span class=\"ez-toc-section\" id=\"how-should-mccbs-and-the-ats-be-coordinated\"><\/span>How Should MCCBs and the ATS Be Coordinated?<span class=\"ez-toc-section-end\"><\/span><\/h2>\r\n\r\n  <p>\r\n    The ATS performs source transfer. Feeder protective devices perform protection and isolation functions selected for the electrical design. They are related, but they are not interchangeable.\r\n  <\/p>\r\n\r\n  <p>\r\n    Prospective fault current, conductor protection, protective-device characteristics and the ATS manufacturer's declared ratings all affect the completed design. IEC 60947-6-1:2026 covers transfer switching equipment, while IEC 61439-1 and IEC 61439-2 provide the construction and verification framework for low-voltage switchgear and controlgear assemblies. <span class=\"ats75-source-mark\">[1][2]<\/span>\r\n  <\/p>\r\n\r\n  <div class=\"ats75-warning\">\r\n    <strong>Important:<\/strong> an ATS ampere rating does not by itself prove that the completed backup cabinet is suitable for the available short-circuit conditions. The panel builder must verify the complete protection arrangement and assembly against the applicable project requirements and manufacturer data.\r\n  <\/div>\r\n\r\n  <h2><span class=\"ez-toc-section\" id=\"where-does-the-spd-fit-in-the-ats-cabinet\"><\/span>Where Does the SPD Fit in the ATS Cabinet?<span class=\"ez-toc-section-end\"><\/span><\/h2>\r\n\r\n  <p>\r\n    The SPD performs a completely different function from the ATS. IEC 61643-11:2025 covers surge protective devices intended to limit transient overvoltages and divert surge currents in AC low-voltage power systems. <span class=\"ats75-source-mark\">[3]<\/span>\r\n  <\/p>\r\n\r\n  <p>\r\n    IEC 60364-5-53 provides requirements for the selection and erection of protective, isolation, switching, control and monitoring devices, including the SPD-related provisions in Clause 534. <span class=\"ats75-source-mark\">[4]<\/span>\r\n  <\/p>\r\n\r\n  <p>\r\n    The exact SPD position, protection mode, earthing connection, conductor routing and upstream protective arrangement must therefore be based on the real single-line diagram, earthing arrangement and surge-protection design.\r\n  <\/p>\r\n\r\n  <div class=\"ats75-note\">\r\n    <strong>Buyer meaning:<\/strong> if surge protection is part of the backup cabinet requirement, send the system voltage, earthing arrangement, installation position and panel drawing together with the ATS enquiry. Do not select an SPD simply because it physically fits beside the ATS.\r\n  <\/div>\r\n\r\n  <h2><span class=\"ez-toc-section\" id=\"how-should-a-compact-ats-be-arranged-inside-the-cabinet\"><\/span>How Should a Compact ATS Be Arranged Inside the Cabinet?<span class=\"ez-toc-section-end\"><\/span><\/h2>\r\n\r\n  <p>\r\n    A compact integrated ATS can reduce the switching-device footprint inside a backup power cabinet, but the panel still needs enough room for power terminals, cable bending, upstream protective devices, SPD, control wiring, manual operating access and ventilation.\r\n  <\/p>\r\n\r\n  <figure class=\"ats75-figure\">\r\n    <img loading=\"lazy\"\r\n      src=\"https:\/\/www.cnspd.com\/wp-content\/uploads\/2026\/10\/backup-power-cabinet-ats-component-layout.webp\"\r\n      alt=\"Conceptual backup power cabinet layout with compact ATS, MCCBs, SPD, control terminals, cable routing, and maintenance space\"\r\n      width=\"1448\"\r\n      height=\"1086\"\r\n      loading=\"lazy\"\r\n      decoding=\"async\"\r\n    >\r\n    <figcaption>\r\n      Conceptual cabinet integration layout. LEEYEE supplies the compact ATS device; the complete enclosure, feeder protection, busbars, wiring, SPD arrangement and assembly integration are handled by the panel builder or system integrator.\r\n    <\/figcaption>\r\n  <\/figure>\r\n\r\n  <p>\r\n    IEC 61439-1 establishes general construction, technical-characteristic and verification requirements for low-voltage switchgear and controlgear assemblies, while IEC 61439-2 applies to power switchgear and controlgear assemblies. The equipment installed inside the cabinet must therefore be considered as part of the complete assembly rather than as isolated products. <span class=\"ats75-source-mark\">[2]<\/span>\r\n  <\/p>\r\n\r\n  <h3>1. Confirm cable entry before fixing the ATS position<\/h3>\r\n\r\n  <p>\r\n    Check whether the Normal source, Emergency source and load cables enter from the top, bottom or another defined zone. The ATS position and orientation must suit the real terminal arrangement and leave enough space for conductor bending and termination.\r\n  <\/p>\r\n\r\n  <h3>2. Keep the operating area accessible<\/h3>\r\n\r\n  <p>\r\n    If the selected ATS provides or requires manual operation, the cabinet layout must not block its operating mechanism. Required access for operation, inspection and maintenance should be checked against the actual ATS instructions.\r\n  <\/p>\r\n\r\n  <h3>3. Do not copy a universal clearance value<\/h3>\r\n\r\n  <p>\r\n    There is no single spacing value that should be copied into every generator ATS panel. Required clearance depends on product dimensions, terminals, conductor size, enclosure arrangement, heat dissipation and the assembly design.\r\n  <\/p>\r\n\r\n  <h3>4. Treat temperature rise as an assembly issue<\/h3>\r\n\r\n  <p>\r\n    ATS, MCCBs, SPD, terminals and control equipment all contribute to the physical and thermal conditions inside the cabinet. IEC 61439-1 and IEC 61439-2 include temperature-rise verification within the assembly framework. <span class=\"ats75-source-mark\">[2]<\/span>\r\n  <\/p>\r\n\r\n  <h3>5. Keep power and control wiring understandable<\/h3>\r\n\r\n  <p>\r\n    Large power conductors and small control\/status conductors have different routing and termination requirements. The cabinet should allow both wiring systems to remain clear, maintainable and consistent with the approved schematic.\r\n  <\/p>\r\n\r\n  <h2><span class=\"ez-toc-section\" id=\"a-practical-generator-ats-panel-design-sequence\"><\/span>A Practical Generator ATS Panel Design Sequence<span class=\"ez-toc-section-end\"><\/span><\/h2>\r\n\r\n  <p>\r\n    For a panel builder or genset integrator, the safest sequence is to define the system first and then select the ATS inside that system.\r\n  <\/p>\r\n\r\n  <ol class=\"ats75-flow\">\r\n    <li>\r\n      <strong>Define the two sources.<\/strong><br>\r\n      Confirm Utility \/ Normal and Generator \/ Emergency voltage, frequency, phase arrangement and operating concept.\r\n    <\/li>\r\n    <li>\r\n      <strong>Define the protected load.<\/strong><br>\r\n      Confirm rated current, load characteristics and the required continuity strategy.\r\n    <\/li>\r\n    <li>\r\n      <strong>Define poles and neutral arrangement.<\/strong><br>\r\n      Confirm whether the project requires 2P, 3P or 4P and how neutral switching relates to the actual system and earthing design.\r\n    <\/li>\r\n    <li>\r\n      <strong>Define upstream protection.<\/strong><br>\r\n      Confirm protective devices, available fault current and the required coordination using project calculations and manufacturer data.\r\n    <\/li>\r\n    <li>\r\n      <strong>Define the generator-start interface.<\/strong><br>\r\n      Confirm the required ATS-to-genset start command and any feedback, permissive or alarm requirements.\r\n    <\/li>\r\n    <li>\r\n      <strong>Define local and remote status.<\/strong><br>\r\n      List the exact source, position and alarm information required by the operator, BMS or PLC.\r\n    <\/li>\r\n    <li>\r\n      <strong>Check the physical cabinet.<\/strong><br>\r\n      Compare ATS dimensions and terminal arrangement with cable entry, conductor bending, operation, ventilation and maintenance access.\r\n    <\/li>\r\n    <li>\r\n      <strong>Freeze the ATS model only after the drawings agree.<\/strong><br>\r\n      The ATS datasheet, GA drawing, single-line diagram and control schematic should all describe the same final configuration.\r\n    <\/li>\r\n  <\/ol>\r\n\r\n  <h2><span class=\"ez-toc-section\" id=\"what-leeyee-supplies-%e2%80%94-and-what-the-panel-builder-integrates\"><\/span>What LEEYEE Supplies \u2014 and What the Panel Builder Integrates<span class=\"ez-toc-section-end\"><\/span><\/h2>\r\n\r\n  <p>\r\n    The system diagrams above explain how an ATS fits into a generator backup system. The product below shows the type of <strong>compact integrated ATS device supplied by LEEYEE<\/strong> for installation inside a customer-designed panel.\r\n  <\/p>\r\n\r\n  <figure class=\"ats75-product-figure\">\r\n    <img\r\n      src=\"https:\/\/www.cnspd.com\/wp-content\/uploads\/2026\/06\/2.png\"\r\n      alt=\"LEEYEE compact 2-pole and 4-pole automatic transfer switches for utility and generator backup power systems\"\r\n      loading=\"lazy\"\r\n      decoding=\"async\"\r\n    >\r\n    <figcaption>\r\n      LEEYEE compact ATS device examples for utility and generator source transfer. The image shows the actual compact product form; it is not a complete ATS cabinet or generator-room solution.\r\n    <\/figcaption>\r\n  <\/figure>\r\n\r\n  <div class=\"ats75-boundary\">\r\n    <p>\r\n      <strong>LEEYEE supplies the compact integrated ATS device for customer-designed backup power cabinets, ATS panels and generator-room distribution systems.<\/strong>\r\n    <\/p>\r\n    <p>\r\n      The complete generator room, enclosure, busbars, feeder protection, cabling, ventilation, SPD arrangement, generator controller, BMS\/PLC system and assembly verification remain project-level integration work unless separately defined in an agreed supply scope.\r\n    <\/p>\r\n  <\/div>\r\n\r\n  <p>\r\n    The product image also illustrates why the distinction matters. The compact ATS itself provides the source-transfer function and a compact operating interface, while the surrounding cabinet still has to provide the upstream protection, conductor routing, terminals, surge protection and any project-specific external control or monitoring equipment.\r\n  <\/p>\r\n\r\n  <p>\r\n    Visible product features such as two source inputs, load output, Auto\/Manual operation and different pole configurations can help the panel builder understand the physical integration concept. However, additional functions such as remote contacts, alarm outputs or BMS communication must still be confirmed against the exact ATS model and its technical documentation.\r\n  <\/p>\r\n\r\n  <p>\r\n    An ATS datasheet therefore cannot replace a complete cabinet design. The panel builder must combine the actual ATS data with the project single-line diagram, control schematic, generator documentation and applicable assembly requirements.\r\n  <\/p>\r\n\r\n  <p>\r\n    It also prevents a common procurement misunderstanding: a request for a \u201cgenerator ATS cabinet\u201d may refer either to a complete panel or only to the switching device. The enquiry should state clearly which scope is required.\r\n  <\/p>\r\n\r\n  <h2><span class=\"ez-toc-section\" id=\"what-should-you-send-before-ordering-the-ats\"><\/span>What Should You Send Before Ordering the ATS?<span class=\"ez-toc-section-end\"><\/span><\/h2>\r\n\r\n  <p>\r\n    A good ATS enquiry should contain enough information for the supplier to confirm both electrical suitability and physical integration.\r\n  <\/p>\r\n\r\n  <div class=\"ats75-checklist\">\r\n    <h3>Generator ATS Panel \/ Backup Cabinet Checklist<\/h3>\r\n    <ul>\r\n      <li>Single-line diagram<\/li>\r\n      <li>Cabinet GA or available mounting space<\/li>\r\n      <li>System voltage and frequency<\/li>\r\n      <li>Single-phase or three-phase system<\/li>\r\n      <li>Required rated current<\/li>\r\n      <li>Required 2P \/ 3P \/ 4P configuration<\/li>\r\n      <li>Utility \/ Normal source details<\/li>\r\n      <li>Generator \/ Emergency source details<\/li>\r\n      <li>Earthing and neutral arrangement<\/li>\r\n      <li>Upstream protective-device information<\/li>\r\n      <li>Cable entry direction<\/li>\r\n      <li>Required generator-start interface<\/li>\r\n      <li>Required local status indication<\/li>\r\n      <li>Required remote status \/ alarm outputs<\/li>\r\n      <li>BMS or PLC interface requirement, if any<\/li>\r\n      <li>Required standard or project specification<\/li>\r\n      <li>Quantity and OEM requirements<\/li>\r\n    <\/ul>\r\n  <\/div>\r\n\r\n  <div class=\"ats75-cta\">\r\n    <h3>Need to Confirm an ATS for Your Generator Backup Cabinet?<\/h3>\r\n    <p>\r\n      Send the cabinet drawing, system voltage, current, pole configuration, generator information, available installation space and required control signals. LEEYEE can use these details to confirm the compact ATS configuration that should be evaluated for your panel.\r\n    <\/p>\r\n    <button\r\n      type=\"button\"\r\n      class=\"leeyee-about-btn-light leeyee-site-popup-btn\"\r\n      aria-label=\"Send Your ATS Panel Requirement\"\r\n    >\r\n      <span class=\"w-btn-label\">Send Your ATS Panel Requirement<\/span>\r\n    <\/button>\r\n  <\/div>\r\n\r\n  <h2><span class=\"ez-toc-section\" id=\"common-generator-ats-panel-design-mistakes\"><\/span>Common Generator ATS Panel Design Mistakes<span class=\"ez-toc-section-end\"><\/span><\/h2>\r\n\r\n  <h3>Selecting the ATS only by ampere rating<\/h3>\r\n  <p>\r\n    Current rating is important, but a usable selection also depends on system voltage, poles, source arrangement, protection, dimensions, terminal access and control requirements.\r\n  <\/p>\r\n\r\n  <h3>Assuming the ATS replaces upstream protection<\/h3>\r\n  <p>\r\n    The ATS is transfer switching equipment. Feeder protection and complete assembly design still require separate engineering confirmation. <span class=\"ats75-source-mark\">[1][2]<\/span>\r\n  <\/p>\r\n\r\n  <h3>Adding an SPD without checking the actual installation<\/h3>\r\n  <p>\r\n    SPD selection and erection depend on the electrical system, earthing arrangement and surge-protection concept. The SPD should be selected for the actual project rather than added as a generic accessory beside the ATS. <span class=\"ats75-source-mark\">[3][4]<\/span>\r\n  <\/p>\r\n\r\n  <h3>Assuming every ATS has the same generator-start terminals<\/h3>\r\n  <p>\r\n    Generator-start functionality is common in many utility-generator systems, but the actual terminal arrangement, contact ratings and control conditions remain model-specific. <span class=\"ats75-source-mark\">[6]<\/span>\r\n  <\/p>\r\n\r\n  <h3>Ignoring cable and manual operating space<\/h3>\r\n  <p>\r\n    A compact ATS saves space only if the installer can still terminate conductors, operate the mechanism as required and access the device for inspection or maintenance.\r\n  <\/p>\r\n\r\n  <h3>Using a conceptual image as a construction drawing<\/h3>\r\n  <p>\r\n    The diagrams on this page explain system relationships. They are not dimensional drawings, terminal diagrams, short-circuit studies or approved panel schematics.\r\n  <\/p>\r\n\r\n  <h2><span class=\"ez-toc-section\" id=\"faq-for-generator-rooms-and-backup-power-cabinets\"><\/span>FAQ for Generator Rooms and Backup Power Cabinets<span class=\"ez-toc-section-end\"><\/span><\/h2>\r\n\r\n  <div class=\"ats75-faq\">\r\n    <div class=\"ats75-faq-item\">\r\n      <h3>What is the basic generator ATS panel design?<\/h3>\r\n      <p>\r\n        A basic generator ATS panel has two source paths\u2014Utility \/ Normal and Generator \/ Emergency\u2014feeding the ATS, with the ATS output supplying the protected load. Upstream protection, generator controls, SPD and status functions are designed around that power path according to the project requirements.\r\n      <\/p>\r\n    <\/div>\r\n\r\n    <div class=\"ats75-faq-item\">\r\n      <h3>Does an ATS need an MCCB in a generator backup cabinet?<\/h3>\r\n      <p>\r\n        The ATS and protective devices perform different functions. Whether an MCCB or another protective arrangement is required at a particular point must be determined from the project protection design, source characteristics, conductor protection and ATS ratings.\r\n      <\/p>\r\n    <\/div>\r\n\r\n    <div class=\"ats75-faq-item\">\r\n      <h3>Can the ATS directly start the generator?<\/h3>\r\n      <p>\r\n        Many utility-generator transfer systems use the ATS control to initiate generator starting when the Normal source becomes unacceptable. <span class=\"ats75-source-mark\">[6]<\/span> The actual contact type, control voltage, terminal numbers and operating logic must still be confirmed for the selected ATS and genset controller.\r\n      <\/p>\r\n    <\/div>\r\n\r\n    <div class=\"ats75-faq-item\">\r\n      <h3>Should the SPD be installed before or after the ATS?<\/h3>\r\n      <p>\r\n        There is no universal answer without the project single-line diagram. SPD location and protection mode depend on the installation, earthing arrangement, required surge-protection concept and coordination. <span class=\"ats75-source-mark\">[3][4]<\/span>\r\n      <\/p>\r\n    <\/div>\r\n\r\n    <div class=\"ats75-faq-item\">\r\n      <h3>Can ATS status be sent to a BMS or PLC?<\/h3>\r\n      <p>\r\n        Yes, where the selected ATS or control configuration provides the required outputs or approved communication interface. Normal Available, Emergency Available, Load to Normal, Load to Emergency and Fault Alarm should be treated as project signal requirements that must be confirmed against the actual ATS model.\r\n      <\/p>\r\n    <\/div>\r\n\r\n    <div class=\"ats75-faq-item\">\r\n      <h3>How much space should be left around a compact ATS?<\/h3>\r\n      <p>\r\n        Do not use a generic clearance number. Check the actual ATS instructions, conductor size, terminal geometry, cable bending, enclosure arrangement, ventilation, operating access and assembly thermal design. <span class=\"ats75-source-mark\">[2]<\/span>\r\n      <\/p>\r\n    <\/div>\r\n\r\n    <div class=\"ats75-faq-item\">\r\n      <h3>Does LEEYEE supply the complete generator room or ATS cabinet?<\/h3>\r\n      <p>\r\n        This page focuses on the <strong>LEEYEE compact ATS device as a component inside a customer-designed backup power cabinet or generator-room electrical system<\/strong>. Complete cabinet and system integration should be defined separately with the panel builder or system integrator.\r\n      <\/p>\r\n    <\/div>\r\n  <\/div>\r\n\r\n  <h2><span class=\"ez-toc-section\" id=\"references\"><\/span>References<span class=\"ez-toc-section-end\"><\/span><\/h2>\r\n\r\n  <ol class=\"ats75-ref-list\">\r\n    <li>\r\n      <strong>IEC \u2014 IEC 60947-6-1:2026<\/strong>, <em>Low-voltage switchgear and controlgear \u2014 Part 6-1: Multiple function equipment \u2014 Transfer switching equipment<\/em>. Used for the scope and function of transfer switching equipment.\r\n    <\/li>\r\n    <li>\r\n      <strong>IEC \u2014 IEC 61439-1:2020 and IEC 61439-2:2020<\/strong>, <em>Low-voltage switchgear and controlgear assemblies \u2014 Part 1: General rules<\/em> and <em>Part 2: Power switchgear and controlgear assemblies<\/em>. Used for assembly-level construction, technical characteristics, temperature rise and verification context.\r\n    <\/li>\r\n    <li>\r\n      <strong>IEC \u2014 IEC 61643-11:2025<\/strong>, <em>Low-voltage surge protective devices \u2014 Part 11: Surge protective devices connected to AC low-voltage power systems \u2014 Requirements and test methods<\/em>. Used for the function and scope of AC low-voltage SPDs.\r\n    <\/li>\r\n    <li>\r\n      <strong>IEC \u2014 IEC 60364-5-53:2019 + AMD1:2020 + AMD2:2024<\/strong>, <em>Low-voltage electrical installations \u2014 Part 5-53: Selection and erection of electrical equipment \u2014 Devices for protection for safety, isolation, switching, control and monitoring<\/em>. Used for installation-level selection and erection context, including SPD provisions.\r\n    <\/li>\r\n    <li>\r\n      <strong>Eaton<\/strong>, <em>Fundamentals of Automatic Transfer Switches (ATS)<\/em>. Used as an established manufacturer technical reference for Normal source, alternate source, load and utility-generator source arrangements.\r\n    <\/li>\r\n    <li>\r\n      <strong>Cummins<\/strong>, <em>GTEC Transfer Switch<\/em>. Used as a manufacturer technical example of source monitoring, generator starting and utility-to-generator load-transfer sequence. Product-specific Cummins functions are not presented as LEEYEE specifications.\r\n    <\/li>\r\n  <\/ol>\r\n<\/article>\r\n\r\n<script>\r\ndocument.addEventListener('DOMContentLoaded', function () {\r\n  var aboutPopupButtons = document.querySelectorAll('.leeyee-site-popup-btn');\r\n\r\n  aboutPopupButtons.forEach(function (button) {\r\n    button.addEventListener('click', function () {\r\n      var realPopupTrigger = document.querySelector(\r\n        '.w-popup.ush_popup_1 .w-popup-trigger'\r\n      );\r\n\r\n      if (realPopupTrigger) {\r\n        realPopupTrigger.click();\r\n      } else {\r\n        window.open(\r\n          'https:\/\/www.cnspd.com\/contact\/',\r\n          '_blank',\r\n          'noopener'\r\n        );\r\n      }\r\n    });\r\n  });\r\n});\r\n<\/script>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>Generator Room &amp; Backup Cabinet Integration Guide A generator ATS panel should be designed as a complete backup-power system, not as an ATS placed alone inside a cabinet. The panel builder must coordinate the utility source, generator source, upstream protection, compact ATS, surge protection, generator controller, status signals, cable routing and protected load. The real&#8230;<\/p>","protected":false},"author":18,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[490,1,422],"tags":[],"class_list":["post-31702","post","type-post","status-publish","format-standard","hentry","category-isolator-switching","category-news","category-industry-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Generator ATS Panel Design for Backup Power Cabinets | LEEYEE<\/title>\n<meta name=\"description\" content=\"Learn how to integrate a LEEYEE compact ATS into generator rooms and backup power cabinets, including utility and generator sources, MCCBs, SPD, generator start signals, cabinet layout, wiring space and ATS selection requirements.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.cnspd.com\/pt\/ats-generator-room-backup-power-cabinet\/\" \/>\n<meta property=\"og:locale\" content=\"pt_PT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Generator ATS Panel Design for Backup Power Cabinets | LEEYEE\" \/>\n<meta property=\"og:description\" content=\"Learn how to integrate a LEEYEE compact ATS into generator rooms and backup power cabinets, including utility and generator sources, MCCBs, SPD, generator start signals, cabinet layout, wiring space and ATS selection requirements.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.cnspd.com\/pt\/ats-generator-room-backup-power-cabinet\/\" \/>\n<meta property=\"og:site_name\" content=\"Surge Protector, Surge Arrestor, Isolating Switch - LEEYEE\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-23T01:23:50+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-23T01:26:47+00:00\" \/>\n<meta name=\"author\" content=\"Devin Ling\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Escrito por\" \/>\n\t<meta name=\"twitter:data1\" content=\"Devin Ling\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tempo estimado de leitura\" \/>\n\t<meta name=\"twitter:data2\" content=\"14 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.cnspd.com\\\/ats-generator-room-backup-power-cabinet\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.cnspd.com\\\/ats-generator-room-backup-power-cabinet\\\/\"},\"author\":{\"name\":\"Devin Ling\",\"@id\":\"https:\\\/\\\/www.cnspd.com\\\/#\\\/schema\\\/person\\\/f49dbafe62c5b47100ad2d9f88af92d3\"},\"headline\":\"ATS for Generator Rooms and Backup Power Cabinets: Generator ATS Panel Design Guide\",\"datePublished\":\"2026-10-23T01:23:50+00:00\",\"dateModified\":\"2026-10-23T01:26:47+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.cnspd.com\\\/ats-generator-room-backup-power-cabinet\\\/\"},\"wordCount\":2933,\"articleSection\":[\"Isolator &amp; Switching\",\"News\",\"Technical Guides\"],\"inLanguage\":\"pt-PT\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.cnspd.com\\\/ats-generator-room-backup-power-cabinet\\\/\",\"url\":\"https:\\\/\\\/www.cnspd.com\\\/ats-generator-room-backup-power-cabinet\\\/\",\"name\":\"Generator ATS Panel Design for Backup Power Cabinets | LEEYEE\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.cnspd.com\\\/#website\"},\"datePublished\":\"2026-10-23T01:23:50+00:00\",\"dateModified\":\"2026-10-23T01:26:47+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.cnspd.com\\\/#\\\/schema\\\/person\\\/f49dbafe62c5b47100ad2d9f88af92d3\"},\"description\":\"Learn how to integrate a LEEYEE compact ATS into generator rooms and backup power cabinets, including utility and generator sources, MCCBs, SPD, generator start signals, cabinet layout, wiring space and ATS selection requirements.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.cnspd.com\\\/ats-generator-room-backup-power-cabinet\\\/#breadcrumb\"},\"inLanguage\":\"pt-PT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.cnspd.com\\\/ats-generator-room-backup-power-cabinet\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.cnspd.com\\\/ats-generator-room-backup-power-cabinet\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.cnspd.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ATS for Generator Rooms and Backup Power Cabinets: Generator ATS Panel Design Guide\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.cnspd.com\\\/#website\",\"url\":\"https:\\\/\\\/www.cnspd.com\\\/\",\"name\":\"Surge Protector, Surge Arrestor, Isolating Switch - LEEYEE\",\"description\":\"Surge Protector, Surge Arrestor, Isolating Switch - LEEYEE\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.cnspd.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pt-PT\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.cnspd.com\\\/#\\\/schema\\\/person\\\/f49dbafe62c5b47100ad2d9f88af92d3\",\"name\":\"Devin Ling\",\"sameAs\":[\"https:\\\/\\\/cnspd.com\\\/\"],\"url\":\"https:\\\/\\\/www.cnspd.com\\\/pt\\\/author\\\/devin\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Conce\u00e7\u00e3o de pain\u00e9is ATS para geradores em arm\u00e1rios de alimenta\u00e7\u00e3o de reserva | LEEYEE","description":"Saiba como integrar um ATS compacto LEEYEE em salas de geradores e arm\u00e1rios de alimenta\u00e7\u00e3o de reserva, incluindo fontes de rede e de geradores, disjuntores MCCB, SPD, sinais de arranque do gerador, disposi\u00e7\u00e3o do arm\u00e1rio, espa\u00e7o para cablagem e requisitos de sele\u00e7\u00e3o do ATS.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.cnspd.com\/pt\/ats-generator-room-backup-power-cabinet\/","og_locale":"pt_PT","og_type":"article","og_title":"Generator ATS Panel Design for Backup Power Cabinets | LEEYEE","og_description":"Learn how to integrate a LEEYEE compact ATS into generator rooms and backup power cabinets, including utility and generator sources, MCCBs, SPD, generator start signals, cabinet layout, wiring space and ATS selection requirements.","og_url":"https:\/\/www.cnspd.com\/pt\/ats-generator-room-backup-power-cabinet\/","og_site_name":"Surge Protector, Surge Arrestor, Isolating Switch - LEEYEE","article_published_time":"2026-10-23T01:23:50+00:00","article_modified_time":"2026-10-23T01:26:47+00:00","author":"Devin Ling","twitter_card":"summary_large_image","twitter_misc":{"Escrito por":"Devin Ling","Tempo estimado de leitura":"14 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.cnspd.com\/ats-generator-room-backup-power-cabinet\/#article","isPartOf":{"@id":"https:\/\/www.cnspd.com\/ats-generator-room-backup-power-cabinet\/"},"author":{"name":"Devin Ling","@id":"https:\/\/www.cnspd.com\/#\/schema\/person\/f49dbafe62c5b47100ad2d9f88af92d3"},"headline":"ATS for Generator Rooms and Backup Power Cabinets: Generator ATS Panel Design Guide","datePublished":"2026-10-23T01:23:50+00:00","dateModified":"2026-10-23T01:26:47+00:00","mainEntityOfPage":{"@id":"https:\/\/www.cnspd.com\/ats-generator-room-backup-power-cabinet\/"},"wordCount":2933,"articleSection":["Isolator &amp; Switching","News","Technical Guides"],"inLanguage":"pt-PT"},{"@type":"WebPage","@id":"https:\/\/www.cnspd.com\/ats-generator-room-backup-power-cabinet\/","url":"https:\/\/www.cnspd.com\/ats-generator-room-backup-power-cabinet\/","name":"Conce\u00e7\u00e3o de pain\u00e9is ATS para geradores em arm\u00e1rios de alimenta\u00e7\u00e3o de reserva | LEEYEE","isPartOf":{"@id":"https:\/\/www.cnspd.com\/#website"},"datePublished":"2026-10-23T01:23:50+00:00","dateModified":"2026-10-23T01:26:47+00:00","author":{"@id":"https:\/\/www.cnspd.com\/#\/schema\/person\/f49dbafe62c5b47100ad2d9f88af92d3"},"description":"Saiba como integrar um ATS compacto LEEYEE em salas de geradores e arm\u00e1rios de alimenta\u00e7\u00e3o de reserva, incluindo fontes de rede e de geradores, disjuntores MCCB, SPD, sinais de arranque do gerador, disposi\u00e7\u00e3o do arm\u00e1rio, espa\u00e7o para cablagem e requisitos de sele\u00e7\u00e3o do ATS.","breadcrumb":{"@id":"https:\/\/www.cnspd.com\/ats-generator-room-backup-power-cabinet\/#breadcrumb"},"inLanguage":"pt-PT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.cnspd.com\/ats-generator-room-backup-power-cabinet\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.cnspd.com\/ats-generator-room-backup-power-cabinet\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.cnspd.com\/"},{"@type":"ListItem","position":2,"name":"ATS for Generator Rooms and Backup Power Cabinets: Generator ATS Panel Design Guide"}]},{"@type":"WebSite","@id":"https:\/\/www.cnspd.com\/#website","url":"https:\/\/www.cnspd.com\/","name":"Protetor de sobretens\u00e3o, protetor de sobretens\u00e3o, interrutor de isolamento - LEEYEE","description":"Protetor de sobretens\u00e3o, protetor de sobretens\u00e3o, interrutor de isolamento - LEEYEE","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.cnspd.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pt-PT"},{"@type":"Person","@id":"https:\/\/www.cnspd.com\/#\/schema\/person\/f49dbafe62c5b47100ad2d9f88af92d3","name":"Devin Ling","sameAs":["https:\/\/cnspd.com\/"],"url":"https:\/\/www.cnspd.com\/pt\/author\/devin\/"}]}},"_links":{"self":[{"href":"https:\/\/www.cnspd.com\/pt\/wp-json\/wp\/v2\/posts\/31702","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.cnspd.com\/pt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.cnspd.com\/pt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.cnspd.com\/pt\/wp-json\/wp\/v2\/users\/18"}],"replies":[{"embeddable":true,"href":"https:\/\/www.cnspd.com\/pt\/wp-json\/wp\/v2\/comments?post=31702"}],"version-history":[{"count":4,"href":"https:\/\/www.cnspd.com\/pt\/wp-json\/wp\/v2\/posts\/31702\/revisions"}],"predecessor-version":[{"id":31746,"href":"https:\/\/www.cnspd.com\/pt\/wp-json\/wp\/v2\/posts\/31702\/revisions\/31746"}],"wp:attachment":[{"href":"https:\/\/www.cnspd.com\/pt\/wp-json\/wp\/v2\/media?parent=31702"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.cnspd.com\/pt\/wp-json\/wp\/v2\/categories?post=31702"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.cnspd.com\/pt\/wp-json\/wp\/v2\/tags?post=31702"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}